Current through P.L. 171-2024
Section 22-12-9-3 - Duties of contractors or subcontractorsA contractor or subcontractor proposing to convert a residential property from heating oil to another heat source shall inform the property owner of the requirements of this chapter and include in a contract for labor and materials the cost of:
(1) properly removing and disposing of all flammable or combustible liquids from a heating oil tank; and(2) either: (A) removing an outside filling pipe; or(B) permanently securing the tank against accidental filling.As added by P.L. 131-1997, SEC.7.