For purposes of this subsection, a construction project is considered to have begun on the day that the physical erection, installation, alteration, repair, or remodeling of the building or structure commences.
the owner shall hold at least two (2) public hearings concerning the construction project and publish notice of each hearing at least ten (10) days before the hearing is held.
the construction project, including a description of the health care services that will be provided by the hospital or ambulatory outpatient surgical center as a result of the construction project; and
as determined by the owner.
IC 16-21-2-11.5