Ind. Code § 14-34-3-5

Current through P.L. 171-2024
Section 14-34-3-5 - Probable hydrologic consequences of test borings or core samplings

Upon the written request of the operator and if the director finds that the probable total annual production at all locations of a surface coal mining operator will not exceed three hundred thousand (300,000) tons, a qualified public or private laboratory designated by the director shall determine the probable hydrologic consequences and the results of test borings or core samplings required by section 3 of this chapter. The department shall assume the cost of preparation of the determination made under this section.

IC 14-34-3-5

Pre-1995 Recodification Citation: 13-4.1-3-3(c).

As added by P.L. 1-1995, SEC.27.