The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site.
IC 14-30-4-17
The commission may adopt rules under IC 4-22-2 to require that increased water runoff resulting from new construction be impounded on the construction site.
IC 14-30-4-17