The commissioner may not:
a permit specifically authorizing the incineration of PCB until the study required by section 3 of this chapter is concluded.
IC 13-17-10-2
Pre-1996 Recodification Citation: 13-7-16.5-9(c).
The commissioner may not:
a permit specifically authorizing the incineration of PCB until the study required by section 3 of this chapter is concluded.
IC 13-17-10-2
Pre-1996 Recodification Citation: 13-7-16.5-9(c).