Current through P.L. 171-2024
Section 13-15-4-6 - Interim permits(a) Notwithstanding the periods specified in sections 1 through 4 of this chapter and this section, a person proposing to construct, modify, or operate any equipment, facility, or pollution control device that is demonstrated to achieve pollution control or pollution prevention in excess of applicable federal, state, or local requirements may apply to the commissioner for an interim permit to construct, modify, or operate the equipment, facility, or pollution control device.(b) The commissioner shall approve or deny the interim permit not later than sixty (60) days after receipt of the application for an interim permit, unless the applicant and the commissioner agree that a longer review period is necessary.(c) This section does not relieve a person from complying with:(1) the permit requirements provided under this title; and(2) rules adopted under this title; to the extent that this title and the rules are not inconsistent with this section.
Pre-1996 Recodification Citation: 13-7-10.1-4(f).
Amended by P.L. 133-2012, SEC. 102, eff. 1/1/2013.As added by P.L. 1-1996, SEC.5.