225 ILCS 730/4

Current through Public Act 103-1056
Section 225 ILCS 730/4

The Geological Survey shall issue a receipt for each geophysical log and well drilling report within 15 days of receipt of the geophysical log or well drilling report. The issuance of a receipt shall be deemed acceptance of the log or report by the Survey.

225 ILCS 730/4

P.A. 87-744.