For air construction permit applications for carbon dioxide capture projects at existing sources submitted on or after the effective date of this amendatory Act of the 103rd General Assembly, no permit may be issued unless all of the following requirements are met:
The water impact assessment shall consider the water impacts (i) immediately following the project's initial operations, (ii) at the end of the project's expected operational life, and (iii) during a drought or other similar event.
The permit applicant shall submit a certification to the Agency that the applicant has submitted its initial water use impact study and the applicant's ongoing water usage to the Department of Natural Resources. This requirement may be satisfied by submitting to the Agency copies of documents provided to the United States Environmental Protection Agency in accordance with 40 CFR 146.82 if the applicant satisfies the requirements of this Section.
415 ILCS 5/59.1