70 ILCS 1205/8-55

Current through Public Acts 103-1 through 103-587, 103-589, and 103-590
Section 70 ILCS 1205/8-55 - Small design-build projects

In any case where the total overall cost of the project is estimated to be less than $12,000,000, the park district may combine the two-phase procedure for design-build selection described in Section 8-50 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 8-50.

70 ILCS 1205/8-55

Added by P.A. 097-0349,§ 5, eff. 8/12/2011.