Immediately upon completion of a new dam, reservoir or mine tailings impoundment structure or enlargement or repair of a dam, reservoir or mine tailings impoundment structure the owner shall give notice of completion to the director, and as soon thereafter as possible file with the director supplementary drawings or descriptive matter showing or describing the dam, reservoir or mine tailings impoundment structure as actually constructed, including the following:
In connection with the enlargement or repair of a dam, reservoir or mine tailings impoundment structure, the supplementary drawings and descriptive matter need apply only to the new work.
Idaho Code § 42-1716