R.I. Gen. Laws § 23-27.3-120.6

Current through 2024 Public Law 44
Section 23-27.3-120.6 - Contents of certificate

The certificate shall certify compliance with the provisions of this code and the purpose for which the building or structure may be used in its several parts, and shall be issued by the building official within ten (10) days after final inspection; provided, that the provisions of the approved permits and of the applicable codes for which permits are required have been met. For use groups H, S, M, F, and B, the certificate of use and occupancy shall specify: the use group, in accordance with the provisions of this chapter; the maximum live load on all floors as prescribed in this chapter; the occupancy load in the building and all parts of the building as defined in this chapter; and any special stipulations, and conditions of the building permit.

R.I. Gen. Laws § 23-27.3-120.6

P.L. 1976, ch. 256, § 1; P.L. 1999, ch. 430, § 3.