The purpose of this project shall be to convert an existing transmission line to a high phase order line, carry out test and operation procedures and provide results of these procedures for evaluation.
N.Y. Pub. Auth. Law § 1881
The purpose of this project shall be to convert an existing transmission line to a high phase order line, carry out test and operation procedures and provide results of these procedures for evaluation.
N.Y. Pub. Auth. Law § 1881