Colo. Rev. Stat. § 38-35.7-109

Current through Chapter 492 of the 2024 Legislative Session
Section 38-35.7-109 - Electric vehicle charging and heating systems - options - definitions
(1)
(a) A person that builds a new residence for which a buyer is under contract shall offer the buyer the opportunity to have the residence's electrical system include one of the following:
(I) An electric vehicle charging system;
(II) Upgrades of wiring planned by the builder to accommodate future installation of an electric vehicle charging system; or
(III) A two-hundred-eight- to two-hundred-forty-volt alternating current plug-in receptacle in an appropriate place accessible to a motor vehicle parking area.
(b) A person that builds a new residence for which a buyer is under contract shall offer the buyer the opportunity to have the residence include an efficient electrical heating system, including an electric water heater, electric boiler, or electric furnace or heat-pump system.
(c) A person that builds a new residence for which a buyer is under contract shall offer the buyer pricing, energy efficiency, and utility bill information for each natural gas, electric, or other option available from and information pertaining to those options from the federal Energy Star program, as defined in section 6-7.5-102 (24), or similar information about energy efficiency and utilization reasonably available to the person building the residence.
(d) Subsection (1)(a) of this section does not apply to a residence in which the electrical system has been substantially installed before a buyer enters into a contract to purchase the residence. Subsection (1)(b) of this section does not apply to a residence in which the heating system has been substantially installed before a buyer enters into a contract to purchase the residence.
(2) To comply with this section, the offer required by subsection (1) of this section must be made in accordance with the builder's construction schedule for the residence.
(3) Nothing in this section precludes a person that builds a new residence from:
(a) Subjecting electric vehicle charging system upgrades to the same terms and conditions as other upgrades, including charges related to upgrades, deposits required for upgrades, deadlines, and construction timelines;
(b) Selecting the contractors that will complete the installation of electric vehicle charging system upgrades;
(c) Stipulating in the purchase agreement or sales contract that:
(I) Electric vehicle charging system upgrades are based on technology available at the time of installation and might not support all electric vehicle charging systems or systems installed in the future; and
(II) The person that builds a new residence is not liable for any additional upgrades, retrofits, or other alterations to the residence necessary to accommodate an electric vehicle charging system installed in the future.
(4) As used in this section:
(a) "Electric vehicle charging system" means:
(I) An electric vehicle charging system as defined in section 38-12-601 (6)(a) that has power capacity of at least 6.2 kilowatts, that is Energy Star certified, and that has the ability to connect to the internet; or
(II) An inductive residential charging system for battery-powered electric vehicles that is certified by Underwriters Laboratories or an equivalent certification, that complies with the current version of article 625 of the National Electrical Code, published by the National Fire Protection Association, and other applicable industry standards, that is Energy Star certified, and that has the ability to connect to the internet.
(b) "Residence" means a single-family owner-occupied detached dwelling.
(5)
(a) This section applies to contracts entered into on or after September 14, 2020, to purchase new residences built on or after September 14, 2020.
(b) This section does not apply to:
(I) An unoccupied home serving as sales inventory or a model home; or
(II) A manufactured home as defined in section 24-32-3302 (20).

C.R.S. § 38-35.7-109

Amended by 2023 Ch. 285,§ 11, eff. 8/7/2023.
Added by 2020 Ch. 193, § 3, eff. 9/14/2020.
L. 2020: Entire section added, (HB 20-1155), ch. 896, p. 896, § 3, effective September 14.
2023 Ch. 285, was passed without a safety clause. See Colo. Const. art. V, § 1(3).