Va. Code § 62.1-44.15:22

Current with changes from the 2024 legislative session through ch. 845
Section 62.1-44.15:22 - [For contingent expiration date, see Acts 2021, Sp. Sess. I, c. 100] Water withdrawals and preservation of instream flow
A. Conditions contained in a Virginia Water Protection Permit may include but are not limited to the volume of water which may be withdrawn as a part of the permitted activity and conditions necessary to protect beneficial uses. Domestic and other existing beneficial uses shall be considered the highest priority uses. The Board is authorized to utilize and incorporate comprehensive groundwater, surface water, and aquifer data in its permit decision. Such data may include information relating to water levels, flow rates, and water quality.
B. Notwithstanding any other provision, no Virginia Water Protection Permit shall be required for any water withdrawal in existence on July 1, 1989; however, a permit shall be required if a new § 401 certification is required to increase a withdrawal. No Virginia Water Protection Permit shall be required for any water withdrawal not in existence on July 1, 1989, if the person proposing to make the withdrawal received a § 401 certification before January 1, 1989, with respect to installation of any necessary withdrawal structures to make such withdrawal; however, a permit shall be required before any such withdrawal is increased beyond the amount authorized by the certification.
C. The Board may issue an Emergency Virginia Water Protection Permit for a new or increased withdrawal when it finds that because of drought there is an insufficient public drinking water supply that may result in a substantial threat to human health or public safety. Such a permit may be issued to authorize the proposed activity only after conservation measures mandated by local or state authorities have failed to protect public health and safety and notification of the agencies designated in § 62.1-44.15:20C and only for the amount of water necessary to protect public health and safety. These agencies shall have five days to provide comments or written recommendations on the issuance of the permit. Notwithstanding the provisions of § 62.1-44.15:20B, no public comment shall be required prior to issuance of the emergency permit. Not later than 14 days after the issuance of the emergency permit, the permit holder shall apply for a Virginia Water Protection Permit authorized under the other provisions of this section. The application for the Virginia Water Protection Permit shall be subject to public comment for a period established by the Board. Any Emergency Virginia Water Protection Permit issued under this section shall be valid until the Board approves or denies the subsequent request for a Virginia Water Protection Permit or for a period of one year, whichever occurs sooner. The fee for the emergency permit shall be 50 percent of the fee charged for a comparable Virginia Water Protection Permit.

Va. Code § 62.1-44.15:22

2007, c. 659.
Amended by Acts 2024 c. 251,§ 1, eff. 7/1/2024.
Amended by Acts 2007, § c. 659.
Acts 2021SP1 c. 100, § 3 "That the provisions of the first enactment of this act shall become effective 30 days after the adoption by the State Water Control Board of the regulations required by the second enactment of this act."
This section is set out more than once due to postponed, multiple, or conflicting amendments.