"Phase I Utility" means an investor-owned incumbent electric utility that was, as of July 1, 1999, not bound by a rate case settlement adopted by the Commission that extended its application beyond January 1, 2002.
"Project development costs" means all capital and operation and maintenance costs associated with a potential small modular nuclear facility incurred by a Phase I Utility before issuance of a certificate for a small modular nuclear facility located in the Commonwealth, including the costs of evaluation, design, engineering, environmental analysis and permitting, land options or acquisition, and early site permitting, as that term is defined in 10 C.F.R. § 52.1. "Project development costs" does not include the costs to obtain construction permits, combined licensing costs required by the Nuclear Regulatory Commission, or construction costs other than construction costs necessary for early site permitting.
"Small modular nuclear facility" means a nuclear reactor that has a rated electric generating capacity of not more than 500 megawatts that is capable of being constructed and operated either alone or in combination with one or more similar reactors at a single site.
Va. Code § 56-585.1:15