Md. Code, State Fin. & Proc. § 4-803

Current with changes from the 2024 Legislative Session effective on or before 7/1/2024, from Chs.. 2 through 1049
Section 4-803 - Evaluations required
(a) To save both cost and energy, the Department shall project life-cycle costs and perform an energy consumption analysis during the preliminary design phase of the construction or renovation of any building.
(b) Each construction appropriation shall require a State agency, including a district school board, to obtain a projection of life-cycle costs and an energy consumption analysis from the Department.

Md. Code, SF § 4-803

Amended by 2020 Md. Laws, Ch. 289,Sec. 1, eff. 7/1/2020.