Current with changes from the 2024 Legislative Session
Section 20-101 - Definitions(a) In this subtitle the following words have the meanings indicated.(b) "Design/build contract" means a contract that provides for both architectural and engineering design services and construction services as a part of a single contract.(c) "Evaluated bid price" means the price of a bid after adjustment in accordance with objective measurable criteria.(d) "Facilities construction contract" means a contract that provides services for the construction of:(1) a water or wastewater treatment plant;(2) a water or wastewater pumping station and related force mains in the pumping station site limits;(3) a water storage facility;(4) a wastewater storage facility;(5) a building for Commission purposes; or(e) "Objective measurable criteria" means standards that enable the Commission to compare the economy, effectiveness, or value of the subject of the bids.