S.C. Code § 6-29-510

Current through 2024 Act No. 225.
Section 6-29-510 - Planning process; elements; comprehensive plan
(A) The local planning commission shall develop and maintain a planning process which will result in the systematic preparation and continual re-evaluation and updating of those elements considered critical, necessary, and desirable to guide the development and redevelopment of its area of jurisdiction.
(B) Surveys and studies on which planning elements are based must include consideration of potential conflicts with adjacent jurisdictions and regional plans or issues.
(C) The basic planning process for all planning elements must include, but not be limited to:
(1) inventory of existing conditions;
(2) a statement of needs and goals; and
(3) implementation strategies with time frames.
(D) A local comprehensive plan must include, but not be limited to, the following planning elements:
(1) a population element which considers historic trends and projections, household numbers and sizes, educational levels, and income characteristics;
(2) an economic development element which considers labor force and labor force characteristics, employment by place of work and residence, and analysis of the economic base;
(3) a natural resources element which considers coastal resources, slope characteristics, prime agricultural and forest land, plant and animal habitats, parks and recreation areas, scenic views and sites, wetlands, and soil types. Where a separate board exists pursuant to this chapter, this element is the responsibility of the existing board;
(4) a cultural resources element which considers historic buildings and structures, commercial districts, residential districts, unique, natural, or scenic resources, archaeological, and other cultural resources. Where a separate board exists pursuant to this chapter, this element is the responsibility of the existing board;
(5) a community facilities element which considers water supply, treatment, and distribution; sewage system and wastewater treatment; solid waste collection and disposal, fire protection, emergency medical services, and general government facilities; education facilities; and libraries and other cultural facilities;
(6) a housing element which considers location, types, age, and condition of housing, owner and renter occupancy, and affordability of housing. This element includes an analysis to ascertain nonessential housing regulatory requirements, as defined in this chapter, that add to the cost of developing affordable housing but are not necessary to protect the public health, safety, or welfare and an analysis of market-based incentives that may be made available to encourage development of affordable housing, which incentives may include density bonuses, design flexibility, and streamlined permitting processes. The planning commission must solicit input for this analysis from homebuilders, developers, contractors, and housing finance experts when developing this element;
(7) a land use element which considers existing and future land use by categories, including residential, commercial, industrial, agricultural, forestry, mining, public and quasi-public, recreation, parks, open space, and vacant or undeveloped;
(8) a transportation element that considers transportation facilities, including major road improvements, new road construction, transit projects, pedestrian and bicycle projects, and other elements of a transportation network. This element must be developed in coordination with the land use element, to ensure transportation efficiency for existing and planned development;
(9) a priority investment element that analyzes the likely federal, state, and local funds available for public infrastructure and facilities during the next ten years, and recommends the projects for expenditure of those funds during the next ten years for needed public infrastructure and facilities such as water, sewer, roads, and schools. The recommendation of those projects for public expenditure must be done through coordination with adjacent and relevant jurisdictions and agencies. For the purposes of this item, "adjacent and relevant jurisdictions and agencies" means those counties, municipalities, public service districts, school districts, public and private utilities, transportation agencies, and other public entities that are affected by or have planning authority over the public project. For the purposes of this item, "coordination" means written notification by the local planning commission or its staff to adjacent and relevant jurisdictions and agencies of the proposed projects and the opportunity for adjacent and relevant jurisdictions and agencies to provide comment to the planning commission or its staff concerning the proposed projects. Failure of the planning commission or its staff to identify or notify an adjacent or relevant jurisdiction or agency does not invalidate the local comprehensive plan and does not give rise to a civil cause of action;
(10) a resiliency element that considers the impacts of flooding, high water, and natural hazards on individuals, communities, institutions, businesses, economic development, public infrastructure and facilities, and public health, safety and welfare. This element includes an inventory of existing resiliency conditions, promotes resilient planning, design and development, and is coordinated with adjacent and relevant jurisdictions and agencies. For the purposes of this item, "adjacent and relevant jurisdictions and agencies" means those counties, municipalities, public service districts, school districts, public and private utilities, transportation agencies, and other public entities that are affected by or have planning authority over the public project. For the purposes of this item, "coordination" means written notification by the local planning commission or its staff to adjacent and relevant jurisdictions and agencies of the proposed projects and the opportunity for adjacent and relevant jurisdictions and agencies to provide comment to the planning commission or its staff concerning the proposed projects. Failure of the planning commission or its staff to identify or notify an adjacent or relevant jurisdiction or agency does not invalidate the local comprehensive plan and does not give rise to a civil cause of action. This element shall be developed in coordination with all preceding elements and integrated into the goals and strategies of each of the other plan elements.
(E) All planning elements must be an expression of the planning commission recommendations to the appropriate governing bodies with regard to the wise and efficient use of public funds, the future growth, development, and redevelopment of its area of jurisdiction, and consideration of the fiscal impact on property owners. The planning elements whether done as a package or in separate increments together comprise the comprehensive plan for the jurisdiction at any one point in time. The local planning commission shall review the comprehensive plan or elements of it as often as necessary, but not less than once every five years, to determine whether changes in the amount, kind, or direction of development of the area or other reasons make it desirable to make additions or amendments to the plan. The comprehensive plan, including all elements of it, must be updated at least every ten years.

S.C. Code § 6-29-510

Amended by 2023 S.C. Acts, Act No. 57 (SB 284),s 7, eff. 5/19/2023.
Amended by 2020 S.C. Acts, Act No. 163 (SB 259),s 2, eff. 9/29/2020.
2007 Act No. 31, Section 2, eff 5/23/2007; 1994 Act No. 355, Section 1.

2023 Act No. 57, Section 9, provides as follows:

"SECTION 9. Before the beginning of the 2030 Legislative Session, the Director of the Department of Parks, Recreation and Tourism, in consultation with the Secretary of Commerce and the Commissioner of Agriculture, shall issue a report to the General Assembly detailing the effects on tourism and workforce housing resulting from the codified provisions of this act."