S.C. Code § 29-5-10

Current through 2024 Act No. 225.
Section 29-5-10 - Lien of person furnishing labor and materials for buildings or structures; offers of settlement
(a) A person to whom a debt is due for labor performed or furnished or for materials furnished and actually used in the erection, alteration, or repair of a building or structure upon real estate or the boring and equipping of wells, by virtue of an agreement with, or by consent of, the owner of the building or structure, or a person having authority from, or rightfully acting for, the owner in procuring or furnishing the labor or materials shall have a lien upon the building or structure and upon the interest of the owner of the building or structure in the lot of land upon which it is situated to secure the payment of the debt due to him. The costs which may arise in enforcing or defending against the lien under this chapter, including a reasonable attorney's fee, may be recovered by the prevailing party. The fee must be determined by the court in which the action is brought but the fee and the court costs may not exceed the amount of the lien. As used in this section, labor performed or furnished in the erection, alteration, or repair of any building or structure upon any real estate includes the preparation of plans, specifications, and design drawings and the work of making the real estate suitable as a site for the building or structure. The work is considered to include, but not be limited to, the grading, bulldozing, leveling, excavating, and filling of land (including the furnishing of fill soil), the grading and paving of curbs and sidewalks and all asphalt paving, the construction of ditches and other drainage facilities, and the laying of pipes and conduits for water, gas, electric, sewage, and drainage purposes, and the disposal of any construction and demolition debris, as defined in Section 44-96-40(6), including final disposal by a construction and demolition landfill. Any private security guard services provided by any person at the site of the building or structure during its erection, alteration, or repair is considered to be labor performed or furnished within the meaning of this section. As used in this section, materials furnished and actually used include tools, appliances, machinery, or equipment supplied for use on the building or structure to the extent of their reasonable rental value during their actual use. "Person" as used in this section means any individual, corporation, partnership, proprietorship, firm, enterprise, franchise, association, organization, or other entity. For purposes of this section, the term "materials" includes flooring, floor coverings, and wall coverings.
(b) Not less than fifteen days before the first term of court at which the trial is set, either party may file and serve on the other party an offer of settlement, and within ten days thereafter the party served may respond by filing and serving his offer of settlement. The offer shall state that it is made under this section and specify the amount, exclusive of interest and costs, which the party serving the offer is willing to agree constitutes a settlement of the lien. If the action is not reached for trial, then not less than fifteen days before the next term of court and subsequent terms of court at which the trial is set, either party may file and serve on the other party an offer of settlement or an amendment of a prior offer of settlement and, within ten days after that, the party served may respond by filing and serving his offer or amended offer of settlement. The offer or amended offer supersedes any offer previously made under this section by the same party.

An offer of settlement is considered rejected unless an acceptance in writing is filed and served on the party making the offer, five days before the commencement of the term.

If the offer is rejected, it may not be referred to for any purpose at the trial, but may be considered solely for the purpose of awarding costs and litigation expenses under this section.

For purposes of the award of attorney's fees, the determination of the prevailing party is based on one verdict in the action. One verdict assumes some entitlement to the mechanic's lien and the consideration of compulsory counterclaims. The party whose offer is closer to the verdict reached is considered the prevailing party in the action. If the difference between both offers and the verdict is equal, neither party is considered to be the prevailing party for purposes of determining the award of costs and attorney's fees.

If the plaintiff makes no written offer of settlement, the amount prayed for in his complaint is considered to be his final offer of settlement.

If the defendant makes no written offer of settlement, the value of his counterclaim is considered to be his negative offer of settlement. If the defendant has not asserted a counterclaim, his offer of settlement is considered to be zero.

S.C. Code § 29-5-10

2003 Act No. 51, Section 22; 1999 Act No. 83, Section 1; 1990 Act No. 374, Section 2; 1986 Act No. 408, Section 1; 1976 Act No. 524, Section 1; 1974 (58) 2183; 1973 (58) 80; 1922 (32) 944; 1869 (14) 220; 1816 (6) 32; R. S. 2456; G.S. 2350; Civ. C. '02 Section 3008; Civ. C. '12 Section 4113; Civ. C. '22 Section 5639; 1932 Code Section 8727; 1942 Code Section 8727; 1952 Code Section 45-251; 1962 Code Section 45-251.