Before beginning the construction of a permanent bridge or culvert by day labor or by contract, the county engineer shall file the plans, specifications, estimate of drainage area, estimates of costs, and specific designation of the location of the bridge or culvert in the county engineer's office.
Iowa Code § 309.81
2022 Acts, ch 1021, §65