In addition to the requirement of possessing a Class A permit, persons doing business as or in a name other than the name listed on the Class A permit shall be required to have a separate Class B-1 permit unless the person doing business as or in another name has a separate Class A permit for each business.
Existing retail, off-premise cylinder filling stations formerly certified as authorized agents of a Class A or B-1 permit holder shall obtain a Class F permit on or before August 1, 2015, to continue operations. No permit holder may supply LP-gas to any retail, off-premise cylinder filling station that is required to possess a Class F permit without verification of a current Class F permit with the board.
Before any person engages in or continues in the operation of an individual branch, division, or subdivision or acts as an agent of a valid Class A permit holder to sell, store, or transport liquefied petroleum gas and to install, service, repair, or adjust liquefied petroleum gas containers, tanks and systems at retail, or to install, repair, service, remove, or adjust liquefied petroleum carburetion equipment, or to perform magnetic, hydrostatic, visual, or X-ray inspections of liquefied petroleum gas storage containers, cargo tanks, motor fuel containers and cylinders, the person shall first obtain from the board a Permit B-1, meet the minimum storage requirements set out in Section 9-17-107, and shall execute and file with the board the insurance as herein required. Branches that were in operation when this article became law shall not be required to meet the storage requirement of Section 9-17-107. A Class B-1 permit holder shall not be required to file or maintain separate or additional insurance as specified by this section provided that the Class B-1 permit holder is included in the parent company's Class A permit insurance on file with the board. The holder of a Permit B-1 shall ensure that only trained and qualified personnel perform the functions approved by the permit.
The board shall require holders of a Permit D to submit plans for any proposed installation of any liquefied petroleum gas storage facility they are planning to install that is authorized under the terms of their permit. They shall obtain approval for the location and for the plans from the administrator of the board before construction is begun. All facilities shall be constructed according to rules and regulations of the board and the completed unit shall have board approval before being used. A minimum fee of two hundred dollars ($200) shall be paid to the board at the time the plans for each facility are presented for approval. This fee of two hundred dollars ($200) will cover examination of the plans and one site inspection. An additional fee of fifty dollars ($50) for each inspection trip to the site that is required shall be paid to the board before final approval is given for the facility to be used. These fees may be changed by action of the board.
Before any person engages in or continues the business of calibration, or repair, or both, of liquefied petroleum gas liquid meters, in the State of Alabama and not being a holder of a Permit A, that person shall first obtain from the board a Permit E and shall execute and file with the board the insurance as herein required. The holder of a Permit E shall ensure that only trained and qualified personnel perform the functions approved by the permit.
Ala. Code § 9-17-105 (1975)