Every water company, gas company and every pipeline company shall show in each statement made by them the following particulars, which are in addition to the foregoing requirements:
(1) The total length of all lines of said company, whether within or outside of the state, the total length of each size pipe and of what material each is constructed;(2) The total length of so much of each of said lines as are within this state;(3) The length of each size and kind of lines in each of the counties, cities, towns, school districts, or other tax districts of this state into or through which each size and kind of lines extend, or in which its distribution system, holders, reservoirs, standpipes, drums, tubes, cylinders, meters, services, or other means of storage or distribution are located or used; and(4) The number of miles of right-of-way in the state belonging to such company and the number of miles of right-of-way along public roads or on government land or on or along the streets of incorporated cities and towns used by such company, showing the number of miles of each class separately and by what authority such use is granted.Ala. Code § 40-21-10 (1975)
Acts 1935, No. 194, p. 256; Code 1940, T. 51, §151.