Cal. Wat. Code § 80820

Current through the 2024 Legislative Session.
Section 80820 - Powers of department
(a)
(1) Consistent with Sections 380, 454.51, 454.52, 454.53, and 454.54 of the Public Utilities Code and this division, if the commission requests the department to procure eligible energy resources, and the department elects to exercise its central procurement function to conduct one or more competitive solicitations or enter into contracts for eligible energy resources pursuant to paragraph (4) of subdivision (a) of Section 454.52 of the Public Utilities Code, the commission, in consultation with the department, shall develop and adopt procedures and requirements that govern competitive procurement by, obligations on, and recovery of costs incurred by the department pursuant to this division.
(2) The commission and the department shall establish a procurement group to advise the department on the procurement undertaken pursuant to this division.
(3) The department shall not enter into new contracts pursuant to this division on or after January 1, 2035.
(b) In evaluating the bids received through a solicitation, the department shall consider all of the following:
(1) For eligible energy resources dependent on the development of a project, that project's viability, including, but not limited to, developer experience, developer financial strength and creditworthiness sufficient to eliminate financing contingencies, and the status of required permits and licenses, including a commitment to submit a consistency certification provided pursuant to the federal Coastal Zone Management Act of 1972 (16 U.S.C. Sec. 1451 et seq.) to the California Coastal Commission for offshore wind energy development projects, to the extent required.
(2) The ability to meet in-service dates offered during the solicitation and the ability to meet those in-service dates without escalation in cost.
(3) The useful life of the project.
(4) The capability to supply energy, capacity, and ancillary services at locations, times of day, and for durations that meet the state's energy resource needs, as determined by the department and the commission.
(5) The bidder's economic and local community impact, workforce development needs and opportunities, environmental impact mitigation plan, and equipment acquisition and supply chain investment plan.
(6) A plan to contribute to large-scale, regional, or statewide baseline and ongoing monitoring of coastal waters and wildlife, if applicable.
(7) Any other criteria determined by the commission or the department.
(c) Every bid for the development of an eligible energy resource project selected by the department shall include the bidder's certification that either of the following are true:
(1) The entirety of the construction of the eligible energy resource project is a public work for purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.
(2) The construction of the eligible energy resource project is not in its entirety a public work for which prevailing wages are required to be paid pursuant to Article 1 (commencing with Section 1720) of Chapter 1 of Part 7 of Division 2 of the Labor Code, but all construction workers employed on the project will be paid at least the general prevailing rate of per diem wages for the type of work and geographic area, as determined by the Director of Industrial Relations pursuant to Sections 1773 and 1773.9 of the Labor Code, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate. If the eligible energy resource project is subject to this paragraph, for those portions of the eligible energy resource project that are not a public work, all of the following requirements shall apply:
(A) The bidder shall ensure that the prevailing wage requirement is included in all contracts for the performance of all construction work.
(B) All contractors and subcontractors shall pay to all construction workers employed in the construction of the eligible energy resource project at least the general prevailing rate of per diem wages, except that apprentices registered in programs approved by the Chief of the Division of Apprenticeship Standards may be paid at least the applicable apprentice prevailing rate.
(C) All contractors and subcontractors performing construction work on the eligible energy resource project shall employ apprentices at no less than the ratio required in Section 1777.5 of the Labor Code.
(D) Except as specified in subparagraph (F), all contractors and subcontractors performing construction work shall maintain and verify payroll records pursuant to Section 1776 of the Labor Code, make those records available for inspection and copying pursuant to Section 1776 of the Labor Code, and furnish those payroll records to the Labor Commissioner pursuant to Section 1771.4 of the Labor Code.
(E) Except as specified in subparagraph (F), the obligation of the contractors and subcontractors to pay prevailing wages and employ apprentices may be enforced by the Labor Commissioner through the issuance of a civil wage and penalty assessment pursuant to Section 1741 of the Labor Code, which may be reviewed pursuant to Section 1742 of the Labor Code, within 18 months after the completion of the project, by an underpaid worker through an administrative complaint or civil action, or by a joint labor-management committee though a civil action pursuant to Section 1771.2 of the Labor Code. If a civil wage and penalty assessment is issued, the contractor, subcontractor, and surety on a bond issued to secure the payment of wages covered by the assessment shall be liable for liquidated damages pursuant to Section 1742.1 of the Labor Code.
(F) Subparagraphs (D) and (E) do not apply if all contractors and subcontractors performing construction work on the eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(i) Provisions requiring payment of prevailing wages to all construction workers employed in the construction of the eligible energy resource project and for enforcement of that obligation through an arbitration procedure.
(ii) Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a relevant local agency.
(iii) Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required in Section 1777.5 of the Labor Code.
(iv) Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the multicraft core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(d) Every bid for the development of an eligible energy resource project selected by the department shall include the bidder's certification that a skilled and trained workforce will be used to perform all construction work on the eligible energy resource project, consistent with all of the following requirements:
(1) The bidder shall require in all contracts for the performance of work that every contractor and subcontractor at every tier will individually use a skilled and trained workforce to construct the eligible energy resource project.
(2) Every contractor and subcontractor shall use a skilled and trained workforce to construct the eligible energy resource project.
(3) Except as specified in subdivision (c), contractors and subcontractors that fail to use a skilled and trained workforce shall be subject to the penalties provided in Section 2603 of the Public Contract Code. Penalties for a contractor's or subcontractor's failure to comply with the requirement to use a skilled and trained workforce may be assessed by the Labor Commissioner within 18 months of completion of the project using the same procedures for issuance of civil wage and penalty assessments pursuant to Section 2603 of the Public Contract Code. Penalties shall be paid to the State Public Works Enforcement Fund.
(4) For purposes of this subdivision, a bidder shall be considered to be an "awarding body" under Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code. Except as specified in paragraph (5), the bidder shall retain records, including copies of monthly reports, that demonstrate compliance with Chapter 2.9 (commencing with Section 2600) of Part 1 of Division 2 of the Public Contract Code while the eligible energy resource project or contract is being performed and for three years after completion of the eligible energy resource project or contract. The bidder shall submit these records immediately upon request of the commission. When submitted to the commission, these records shall be a public record under the California Public Records Act (Division 10 (commencing with Section 7920.000) of Title 1 of the Government Code) and shall be open to public inspection.
(5) Paragraphs (3) and (4) do not apply if all contractors and subcontractors performing work on the eligible energy resource project are subject to a project labor agreement. The project labor agreement shall also include, but not be limited to, all of the following requirements:
(A) Provisions requiring compliance with the skilled and trained workforce requirement and for enforcement of that obligation through an arbitration procedure.
(B) Targeted hiring provisions, including a targeted hiring plan, on a craft-by-craft basis to address job access for local, disadvantaged, or underrepresented workers, as defined by a local agency.
(C) Apprenticeship use provisions that commit all parties to increasing the share of work performed by state-registered apprentices above the state-mandated minimum ratio required by Section 1777.5 of the Labor Code.
(D) Apprenticeship use provisions that commit all parties to hiring and retaining a certain percentage of state-registered apprentices that have completed the Multi-Craft Core preapprenticeship training curriculum described in Section 14005 of the Unemployment Insurance Code.
(e) For purposes of this section, the following definitions apply:
(1) "Construction" means any new construction work and subsequent construction and construction maintenance work following initial completion that is contracted out to a contractor in the construction industry, including construction work on a barge, construction staging area, or construction area when being used as a construction work platform and the rigging and hoisting of construction materials directly from a barge, construction staging area, or construction area into the construction process for a construction project. "Construction" does not include the loading and unloading of cargo to and from vessels and the movement of cargo to and from vessels at any port facility to the cargo's point of rest.
(2) "Project labor agreement" has the same meaning as defined in Section 2500 of the Public Contract Code.
(3) "Skilled and trained workforce" has the same meaning as defined in Section 2601 of the Public Contract Code.

Ca. Water Code § 80820

Added by Stats 2023 ch 367 (AB 1373),s 15, eff. 10/7/2023.