Current through the 2024 Legislative Session.
Section 30950.3 - Long-range plan for completion of all projects(a) The authority shall prepare, adopt, and from time to time revise, a long-range bridge toll plan for the completion of all projects within its jurisdiction, including those of the Regional Traffic Relief Plan described in subdivision (c) of Section 30914 and the Regional Measure 3 expenditure plan described in subdivision (a) of Section 30914.7.(b) The authority shall give first priority to projects and expenditures that are deemed necessary by the department and the authority to preserve and protect the bridge structures.Ca. Sts. and High. Code § 30950.3
Amended by Stats 2017 ch 650 (SB 595),s 14, eff. 1/1/2018.Amended by Stats 2003 ch 715 (SB 916),s 79, eff. 1/1/2004.Amended by Stats 2001 ch 745 (SB 1191), s 209, eff. 10/11/2001.