Bridge | 1988 Increase (Two-axle vehicles) |
Antioch Bridge | $0.50 |
Benicia-Martinez Bridge | .60 |
Carquinez Bridge | .60 |
Dumbarton Bridge | .25 |
Richmond-San Rafael Bridge | .00 |
San Francisco-Oakland Bay Bridge | .25 |
San Mateo-Hayward Bridge | .25 |
Portions of the 1988 toll increase were dedicated to transit purposes, and these amounts shall be calculated as up to 2 percent of the revenue generated each year by the collection on all bridges of the base toll at the level established by the 1988 toll increase. The Metropolitan Transportation Commission shall allocate two-thirds of these amounts for transportation projects, other than those specified in Sections 30912 and 30913 and in subdivision (a) of Section 30914, which are designed to reduce vehicular traffic congestion and improve bridge operations on any bridge, including, but not limited to, bicycle facilities and for the planning, construction, operation, and acquisition of rapid water transit systems. The commission shall allocate the remaining one-third solely for the planning, construction, operation, and acquisition of rapid water transit systems. The plans for the projects may also be funded by these moneys. Funds made available for rapid water transit systems pursuant to this subdivision shall be allocated to the San Francisco Bay Area Water Emergency Transportation Authority beginning on the date specified in the adopted transition plan developed by the authority pursuant to subdivision (b) of Section 66540.32 of the Government Code.
Ca. Sts. and High. Code § 30913