Within three months of its acquisition of a production facility or at the time of the initial production at its production facility, the facility operator shall file with the division a spill contingency plan.
Ca. Pub. Res. Code § 3270.1
Within three months of its acquisition of a production facility or at the time of the initial production at its production facility, the facility operator shall file with the division a spill contingency plan.
Ca. Pub. Res. Code § 3270.1