Cal. Pub. Contract Code § 22162.8

Current through the 2023 Legislative Session.
Section 22162.8 - [Effective until 1/1/2031] Design-build contracting for the Town of Paradise
(a) Upon approval of its governing body, the Paradise Irrigation District may use the design-build contracting process described in this chapter to award a contract for a water conveyance pipeline from the Town of Paradise to the City of Chico.
(b) Upon approval of a majority of the Paradise Town Council, the Town of Paradise may use the design-build contracting process described in this chapter to provide for the provision of sewer treatment to the Town of Paradise, including for infrastructure connecting the Town of Paradise to an existing treatment facility.

Ca. Pub. Cont. Code § 22162.8

Added by Stats 2021 ch 689 (AB 36),s 1, eff. 1/1/2022.