If the defaults are not remedied within the time specified in the notice, the contractor's control shall terminate as of the expiration of that time.
Ca. Pub. Cont. Code § 10254
If the defaults are not remedied within the time specified in the notice, the contractor's control shall terminate as of the expiration of that time.
Ca. Pub. Cont. Code § 10254