Current through the 2024 Legislative Session.
Section 130062 - Application for extension of SPC-1 building(a) For the purposes of this section, the following terms have the following meanings: (1) "Rebuild plan" means a plan to meet seismic standards primarily by constructing a new conforming SPC-5 building for use in lieu of an SPC-1 building.(2) "Removal plan" means a plan to meet seismic standards primarily by removing acute care services or beds from the hospital's license.(3) "Replacement plan" means a plan to meet seismic standards primarily by relocating acute care services or beds from nonconforming buildings into a conforming building.(4) "Retrofit plan" means a plan to meet seismic standards primarily by modifying the building in a manner that brings the building up to SPC-2, SPC-4D, or SPC-5 standards.(b)(1) Except as specified in paragraph (2), all hospitals seeking an extension for their SPC-1 buildings shall submit to the department an application, in a manner acceptable to the department, by April 1, 2019.(2) If Providence Tarzana Medical Center in the City of Los Angeles or UCSF Benioff Children's Hospital in the City of Oakland seeks an extension for its SPC-1 buildings, it shall submit to the department an application, in a manner acceptable to the department, by September 1, 2019.(3) At a minimum, an application described in paragraph (1) or (2) shall state which of the seismic compliance methods described in subdivision (a) will be used for each SPC-1 building.(c) A hospital owner that has been granted an extension pursuant to subdivision (g) of Section 130060 or subdivision (b) of Section 130061.5 may request, and the department shall grant, an additional extension of time as set forth in this section.(d)(1) For a hospital that seeks an extension for compliance based on a replacement plan or retrofit plan, the owner shall submit a construction schedule, obtain a building permit, and begin construction by April 1, 2020.(2) Using the construction schedule submitted pursuant to paragraph (1), the hospital and the department shall identify at least two major milestones relating to the compliance plan that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (2), or to meet any milestone agreed to pursuant to paragraph (2), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) Final seismic compliance shall be achieved by July 1, 2022.(e)(1) For a hospital that seeks an extension for compliance based on a rebuild plan, the department shall grant an extension of up to five years. The owner shall submit, in a manner acceptable to the department, no later than July 1, 2020, the rebuild plan, deemed ready for review, and shall submit a construction schedule, obtain a building permit, and begin construction no later than January 1, 2022.(2) The hospital and the department shall identify at least two major milestones, agreed upon by the hospital and the department, that will be used as the basis for determining whether the hospital is making adequate progress toward meeting the seismic compliance deadline.(3) Failure to comply with the requirements described in paragraph (1) or (4), or to meet any milestone agreed to pursuant to paragraph (2) or (4), shall result in the assessment of a fine of five thousand dollars ($5,000) per calendar day until the requirements or milestones, respectively, are met.(4) For a hospital that has previously submitted to the department a rebuild project under construction, the department may accept certification from the hospital that it has obtained appropriate building permits consistent with an approved incremental plan review and that construction thereunder has commenced and is continuing. The previously approved construction schedule shall be amended to reflect the extension being requested, and at least two new major milestones shall be identified. The owner shall not be required to resubmit construction plans previously submitted to the department, and the department may not impose new or different requirements for any increment already approved or building permit already issued by the department as a condition for granting an extension.(5) Final seismic compliance shall be achieved, and a certificate of occupancy shall be obtained, by January 1, 2025.(f) The department may grant an adjustment to the requirements described in paragraph (1) or (2) of subdivision (d) or paragraph (1) or (4) of subdivision (e), or the milestones agreed to pursuant to paragraph (2) of subdivision (d) or paragraph (2) or (4) of subdivision (e), as necessary to deal with contractor, labor, or material delays, or with acts of God, or with governmental entitlements, experienced by the hospital. If that adjustment is granted, the hospital shall submit a revised construction schedule, and the hospital and the department shall identify at least two new major milestones consistent with the adjustment. Failure to comply with the revised construction schedule or meet any of the major milestones shall result in penalties as specified in paragraph (3) of subdivision (d) and paragraph (3) of subdivision (e). The adjustment shall not exceed the corresponding final seismic compliance date specified in paragraph (4) of subdivision (d) or paragraph (5) of subdivision (e).(g) The duration of an extension granted by the department pursuant to this section shall not exceed the maximums permitted by this section. Moreover, within that limit, the department shall not grant an extension that exceeds the amount of time needed by the owner to come into compliance. The determination by the department regarding the length of the extension to be granted shall be based upon a showing by the owner of the facts necessitating the additional time. It shall include a review of the plan and all the documentation submitted in the application for the extension, and shall permit only that additional time necessary to allow the owner to deal with compliance plan issues that cannot be fully met without the extension.(h) No extension shall be granted pursuant to this section for SPC-1 buildings unless the owner has submitted to the department, by January 1, 2018, a seismic compliance plan.(i) An extension shall not be granted pursuant to this section for seismic compliance based upon a removal plan.(j)(1) Except as specified in paragraph (2), in lieu of the reporting requirements described in Section 130061, a hospital granted an extension pursuant to this section shall provide a quarterly status report to the department, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved.(2) In lieu of the reporting requirements described in Section 130061, if Providence Tarzana Medical Center in the City of Los Angeles or UCSF Benioff Children's Hospital in the City of Oakland is granted an extension pursuant to this section based on an application submitted on or after April 1, 2019, the first quarterly status report shall be due on October 1, 2019, and every January 1, April 1, July 1, and October 1 thereafter, until seismic compliance is achieved.(3) The office shall post the status reports described in paragraphs (1) and (2) on its internet website.(k) Before June 1, 2019, the office shall provide the Legislature with an inventory of the SPC category of each hospital building. A report submitted to the Legislature pursuant to this subdivision shall be submitted in compliance with Section 9795 of the Government Code.(l)(1) The office may revoke an extension granted pursuant to this section for a hospital building where the assessment for a penalty exceeds 60 days.(2) Notwithstanding any other law, any penalties assessed pursuant to this section shall be deposited into the General Fund within 45 days of assessment or within 45 days following a determination on appeal, if any. A hospital assessed a penalty pursuant to this section may appeal the assessment to the Hospital Building Safety Board, provided the hospital posts the funds for any penalties with the department, to be held pending the resolution of the appeal.(3) The department shall not issue a construction final or certificate of occupancy for the building until all assessed penalties accrued pursuant to this section have been paid in full or, if an appeal is pending, have been posted subject to resolution of the appeal. Penalties deposited by the hospital pursuant to paragraph (2) shall be considered paid in full for purposes of issuing a construction final or certificate of occupancy. This paragraph is in addition to, and is not intended to supersede, any other requirements that must be met by the hospital for issuance of a construction final or certificate of occupancy.(m) The department may promulgate emergency regulations as necessary to implement this section.Ca. Health and Saf. Code § 130062
Amended by Stats 2021 ch 143 (AB 133),s 332, eff. 7/27/2021.Amended by Stats 2019 ch 38 (SB 78),s 28, eff. 6/27/2019.Added by Stats 2018 ch 673 (AB 2190),s 1, eff. 1/1/2019.