Cal. Civ. Code § 1798.66

Current through the 2023 Legislative Session.
Section 1798.66 - Extension of time limits by Franchise Tax Board

The time limits specified in Article 8 (commencing with Section 1798. 30) may be extended to 60 days by the Franchise Tax Board if the following conditions exist:

(a) The request is made during the period January 1 through June 30; and
(b) The records requested are stored on magnetic tape.

Ca. Civ. Code § 1798.66

Added by Stats. 1977, Ch. 709.