(a) An approved Application for Permit to Drill (APD, Form 1) or an approved Sundry Notice (Form 4) is required prior to the initiation of any well stimulation activity. Additional stimulation fluid information shall be provided to the Commission as an addendum to the APD (Form 1), or as part of a comprehensive drilling/completion/recompletion plan, or on a Sundry Notice (Form 4). A federal fieldwide development document or similar document may be accepted by the Supervisor. The Supervisor may require, prior to the well stimulation, the Owner or Operator to perform a suitable mechanical integrity test of the casing or of the casing-tubing annulus or other mechanical integrity test methods using procedures set forth in Chapter 2, Section 6 and Chapter 4, Section 7(e)(i).
(b) Where multiple stimulation activities will be undertaken for several wells proposed to be drilled to the same zone(s) within an area of geologic similarity, approval may be sought from the Supervisor to accept a comprehensive master drilling/completion/recompletion plan containing the information required. The approved master drilling/completion/recompletion plan will then be referenced on each individual well's Application for Permit to Drill (Form 1).
(c) The Owner or Operator shall provide geological names, geological description and depth of the formation into which well stimulation fluids are to be injected.
(d) The Owner or Operator shall provide detailed information to the Supervisor as to the base stimulation fluid source. The Owner or Operator or service company shall provide to the Supervisor, for each stage of the well stimulation program, the chemical additives, compounds and concentrations or rates proposed to be mixed and injected, including:
(e) The Owner or Operator shall provide a detailed description of the proposed well stimulation design, which shall include:
(f) Upon prior request via Application for Permit to Drill (Form 1), and/or a comprehensive drilling/completion/recompletion plan, or by Well Completion Report (Form 3), or by Sundry Notice (Form 4), and/or by written letter to the Supervisor justifying and documenting the nature and extent of the proprietary information, confidentiality protection shall be provided consistent with Wyo. Stat. Ann. § 16-4-203(d)(v) of the Wyoming Public Records Act for the following records: "trade secrets, privileged information and confidential commercial, financial, geological or geophysical data furnished by or obtained from any person."
(g) The injection of volatile organic compounds, such as benzene, toluene, ethylbenzene and xylene, also known as BTEX compounds or any petroleum distillates, into groundwater is prohibited. The proposed use of volatile organic compounds, such as benzene, toluene, ethylbenzene and xylene, also known as BTEX compounds or any petroleum distillates for well stimulation into hydrocarbon bearing zones is authorized with prior approval of the Supervisor. It is accepted practice to use produced water that may contain small amounts of naturally occurring petroleum distillates as well stimulation fluid in hydrocarbon bearing zones.
(h) The Owner or Operator or service company shall provide the Supervisor, on a Well Completion or Recompletion Log (Form 3), or on a Sundry Notice (Form 4) for an existing well, the following post well stimulation detail:
(i) During the well stimulation operation, the Owner or Operator shall monitor and record the annulus pressure at the bradenhead. If intermediate casing has been set on the well being stimulated, the pressure in the annulus between the intermediate casing and the production casing shall also be monitored and recorded. A continuous record of the annulus pressure during the well stimulation shall be submitted on Well Completion or Recompletion Log (Form 3) or on a Sundry Notice (Form 4).
(j) The Owner or Operator shall provide information to the Supervisor on Well Completion Report (Form 3) or on Sundry Notice (Form 4) as to the amounts, handling, and if necessary, disposal at an identified appropriate disposal facility, or reuse of the well stimulation fluid load recovered during flow back, swabbing, and/or recovery from production facility vessels. Storage of such fluid shall be protective of groundwater as demonstrated by the use of either tanks or lined pits. If lined pits are utilized to store fluid for use in well stimulation, or for reconditioning, for reuse, or to hold for appropriate disposal, then the requirements of Chapter 4, Section 1 of these rules shall be met to protect wildlife and migratory birds.
055-3 Wyo. Code R. § 3-45
Amended, Eff. 6/3/2015.
Amended, Eff. 1/19/2016.
Amended, Eff. 4/1/2016.