045-5 Wyo. Code R. § 5-3

Current through April 27, 2019
Section 5-3 - License Form (WHD Form E-54)

(a) Fonn E-54, with Form E-54A and a detailed Exhibit is the most often used permit for licensing utility crossings and/or encroachments. Forms are provided by the District Office.

(b) The applicant shall fill in the top portion of page one with the name of the owner of the facility, a description of the proposed installation, the Section, Township, Range, the Highway/ Route number. County, and the highway milepost of the proposed facility or the beginning and ending milepost for an encroachment.

In Section 6 indicate the date of the exhibit.

(c) On page two fill in the name of the company or owner of the facility (not the consulting engineer or individual making application on behalf of the owner), mailing address and telephone number, signature of owner or company official and the date it was signed.

(d) Form E-54 may not be used to permit railroad track crossings or water, sanitary sewer, storm sewer, or other municipal systems when the parallel encroachment is located outside of the corporate limits and is over 500 feet in length. (See License Agreement below).

(e) Drilling, blasting or any type of longitudinal (parallel) seismographic investigation will not be allowed within any highway right-of-way. WHD Form M-23, Seismographic Cable Crossing License shall be issued by the District. (See Operating Policy 19-3).

(f) Upon approval of Form E-54, the WHD District Office will return one copy to the applicant with authorization to proceed with construction, retain one copy for the District files, send one copy to the respective WHD Maintenance Foreman, and send one copy to the Utilities Section in Cheyenne for cataloging in the inventory and storing in the Department's permanent files.

045-5 Wyo. Code R. § 5-3