a. A petition for a change in point of diversion must meet the following requirements:
b. The sample petition on page 73 may be used as a guide for preparing a petition for change of point of diversion.
PETITION FOR CHANGE OF POINT OF )
DIVERSION OF PERMIT NO. 21000,) BEFORE THE
THE BLANK DITCH, FROM EAST FORK ) STATE ENGINEER
OF NORTH RIVER. ) CHEYENNE, WYOMING
STATE OF WYOMING )
) SS.
COUNTY OF PLATTE )
COMES NOW, John Doe of Wheatland, County of Platte, State of Wyoming, who being duly sworn on oath according to law, does hereby make the following statement of facts and petition:
- 1. THAT he is the sole owner of Permit No. 21000, the Blank Ditch, diverting water from the East Fork of North River, with priority of January 1, 1960, and of all lands irrigated thereunder, as evidenced by the Certificate of Ownership of the County Clerk of Platte County accompanying this petition.
- 2. THAT Permit No. 21000 is in good standing, with all of the required notices filed, and that beneficial use of water is presently being made within the terms of the permit.
- 3. THAT the petitioner desires to change the location of the point of diversion and head gate of the Blank Ditch from the present and record point of diversion, as shown in Permit No. 21000, which is N. 25° 10' W., 760 feet from the southeast corner of Section 4, T.2SN., R.70W., and in the SEfSEi of said Section 4, to a new point of diversion, which will be N. 76°3 0' E., 1185 feet from the same public survey corner described above, and in the SW1/4SW1/4 of Section 3, T.28N., R.70W., as shown on the map accompanying this petition.
- 4. THAT the change is desired by reason of the fact that the channel of the stream at the present point of diversion has changed its course, and a bar now forms which makes it difficult to operate and maintain the present point of diversion. The proposed new point of diversion does not present this obstacle.
- 5. THAT there are no intervening record points of diversion (head gates) between the present point of diversion and the proposed new point of diversion.
- 6. THAT there are no intervening tributaries or other sources of water between the present point of diversion and the new point of diversion.
- 7. THAT no other appropriator from the same source of supply will be injured in any way.
- 8. THAT a map in duplicate, prepared by E. N. Johnson, a licensed professional engineer and land surveyor, of Laramie, Wyoming, shows the situation and accompanies this petition.
9, THAT recording fees in the amount of S __________ accompany this petition.
IT IS THE PRAYER of the petitioner that this change of point of diversion be allowed without loss of priority; that a proper notation be entered on permit No. 21000; and that the petition be recorded in Miscellaneous Records in the State Engineer's Office.
Respectfully submitted,
(Signed)___________________________________
JOHN DOE
The foregoing instrument is acknowledged before me this ___ day of
__________________________, 19____.
Witness my hand and official seal.
(Signed)___________________________________
Notary Public
My commission expires:___________________________________
037-9 Wyo. Code R. § 9-3