(a) Part 1 - Statement of Problem. Applicant must demonstrate to the satisfaction of the Commission that additional sources of water are needed.
(b) Part 2 - Project Plan. Applicant must prepare and submit a specific and detailed plan of how funds will be spent if awarded. The plan shall include, but is not limited to: - (i) A detailed advance hydro-geologic feasibility study of the area where exploration is anticipated. If such a study is not available, then the costs of obtaining such a study must be included in the project budget.
- (ii) A description of the intended exploration project.
- (iii) A line item budget.
- (iv) Required permits from State and/or Federal agencies to complete exploration.
- (v) A statement of intent that the project work shall:
- (A) Be supervised by a professional geologist (P.G.) licensed in the State of Wyoming.
- (B) Conform to the State Water Well Minimum Construction Standards of the Wyoming State Engineer's Office; and the Water Quality Rules and Regulations of the Wyoming Department of Environmental Quality.
Amended, Eff. 11/27/2017.