023-3 Wyo. Code R. § 3-28

Current through April 27, 2019
Section 3-28 - Service Interruption Reporting

(a) Each utility shall report within 30 days after the end of each calendar quarter the following service interruptions, planned or otherwise:

  • (i) Electric utilities: all service interruptions greater than five minutes, other than meter testing or change outs;
  • (ii) Natural gas utilities: all service interruptions, other than meter testing or change outs;
  • (iii) Water utilities: all service interruptions that result in the loss of service to five or more customers or water meters, whichever is greater.

    These records shall be retained by the utility for a minimum of six years.

(b) Each electric utility shall annually review its Service Interruption Reporting Plan. If there are proposed modifications and definitions of major and minor service interruptions specific to the utility's system, the revised Service Interruption Reporting Plan shall be filed with the Commission by May 1. If, after the utility's review, there is no change to the Service Interruption Reporting Plan, the utility shall so notify the Commission by letter by May 1.

023-3 Wyo. Code R. § 3-28

Adopted, Eff. 3/21/2016.

Amended, Eff. 4/8/2019.