(a) The department may develop and issue general permits pursuant to these regulations which cover Class V facilities for the following subclasses: 5A1, 5A2, 5B1, 5C4, 5C5, 5C6, 5D1, 5D2, 5E1, 5E3, and 5E5. The administrator may issue general permits in other categories as the need arises. 5E3 facilities which were permitted as small wastewater systems prior to April 14, 1998 are permitted by rule under Section 8(c)(v) and are not covered by this section. Facilities in these subclasses which have already been issued individual permits under Chapter 9 or Chapter 16, Water Quality Rules and Regulations may continue under these permits until they are terminated, revoked and reissued, or canceled at the request of the operator. Coverage shall not be extended to any facility if such a facility would be in violation of any state approved source water protection area. Facilities in these subclasses not presently covered by an individual permit will be authorized by permit by rule until the general permit for the specific subclass is issued. The operator of a facility listed in this section shall have two (2) years after the date of issuance of the general permit to:
(b) General permits shall also include:
(c) The administrator may require any operator covered by a general permit to obtain an individual permit for the facility when a review of the information submitted under this section indicates that the general permit would not be protective of groundwater in that specific case. Any operator covered by a general permit may at any time apply for and obtain an individual permit for the same facility. Once issued, an individual permit will replace coverage by the general permit for that facility.
(d) General permits will contain the subclass of injection facility covered, the geographic area covered, the general nature of the fluids to be discharged, and the location of the receiver where the discharge will be allowed. General permits will follow the public notice requirements of Section 22 of this chapter. During each five (5) year review of a general permit, a public notice shall be issued by the department stating that a five (5) year review has been done, listing the facilities covered by a general permit, and stating where the public may obtain a copy of the permit.
(e) Operators of new injection facilities who believe that their facility may be covered by a general permit in class 5C6 facilities may apply for coverage under the general permit for that subclass. If not accepted for coverage under this general permit, the operator shall apply for an individual permit under subclass 5C3.
(f) Operators of new injection facilities who believe that their facility may be covered by a general permit in class 5E5 facilities may apply for coverage under the general permit for that subclass. If not accepted for coverage under this general permit, the operator shall apply for an individual permit under subclass 5E3.
(g) In order to obtain coverage under the general permit all operators of class 5C6 and 5E5 shall submit detailed construction drawings and an abbreviated groundwater study showing the approximate depth to groundwater and a list of water wells within one half mile of the facility.
(h) General permits may be written to require the operator to monitor the water quality of the injected fluid and to submit the information to the department. Existing facilities under this section may be required to monitor injectate quality on a one time basis, on a quarterly basis, a semi-annual basis or annual basis depending on the ability of the facility to cause adverse environmental damage or affect human health.
(i) General permits for Class 5C5 coal bed methane injection facilities shall require that:
020-27 Wyo. Code R. § 27-10
Adopted, Eff. 9/15/2015.
Amended, Eff. 12/3/2018.