An operation plan is required for each new or modified confined swine feeding operations. The plan shall be finalized and approved prior to the approval of the permit. The plan shall include a description of the operation of the following as necessary for the proper management of animal waste facilities:
(a) Feeding and production facilities.
(b) Animal waste collection systems.
(c) Animal waste storage facilities.
(d) Animal waste and wastewater application systems.
(e) Description of emergency operation and response actions.
(f) Sampling, analysis and reporting requirements appropriate for the operation.
(g) Disposal of other wastes:
(h) Operation and maintenance manual.
020-20 Wyo. Code R. § 20-9
Amended, Eff. 6/29/2018.