020-10 Wyo. Code R. § 10-5

Current through April 27, 2019
Section 10-5 - Additional Requirements

Where the proposed coal exploration activity falls within that activity described as exploration by dozing or exploration by drilling, any requirements imposed by the Act or the regulations which may be additional to the above described requirements, including the bonding requirement, may be applicable to the proposed operation. The Administrator shall make a determination, on a case-by-case basis, as to whether any additional requirements shall be imposed.

020-10 Wyo. Code R. § 10-5