Wis. Admin. Code Public Service Commission PSC 114.004

Current through October 28, 2024
Section PSC 114.004 - General requirements
(1), CHARACTER OF CONSTRUCTION, MAINTENANCE AND OPERATION. All electrical power and communication equipment and lines shall be of such construction, and so installed, operated, and maintained as to minimize the loss of life and fire hazard.
(2) CONSTRUCTION, INSPECTION AND REPAIRS.
(a) All construction and equipment shall be cleaned when necessary and inspected at such intervals as experience has shown to be necessary. Any equipment or construction known to be defective so as to endanger life or property shall be promptly repaired, permanently disconnected, or isolated until repairs can be made. Construction, repairs, additions and changes to electrical equipment and conductors shall be made by qualified persons only.
(b) Facilities installed or used in the generation, transmission, distribution, and utilization of electricity shall be designed for such installation or use.

Wis. Admin. Code Public Service Commission PSC 114.004

CR 07-021: CR Register January 2008 No. 625, eff. 2-1-08; CR 13-039: r. and recr Register June 2014 No. 702, eff. 7-1-14.