Wis. Admin. Code PSC § 113.0915

Current through May 28, 2024
Section PSC 113.0915 - Testing of metering installations utilizing pulse devices
(1) Metering installations utilizing pulse initiators and pulse recorders shall be checked for accuracy each billing period by comparing the recorded pulse count against the registration of the corresponding meter. When the results are not in agreement within the accuracy limits of s. PSC 113.0812(2) the pulse devices shall be promptly tested and adjusted to required accuracy or replaced.
(2) Pulse devices shall be tested before use and as part of the complete metering installation whenever the associated watthour meter is tested.

Wis. Admin. Code Public Service Commission § PSC 113.0915

CR Register, July, 2000, No. 535, eff. 8-1-00.