Each control system must be tested before being placed in service to assure that it has been installed properly and will function as required by this part.
Wis. Admin. Code Department of Transportation § app 1 § 193.2325
Each control system must be tested before being placed in service to assure that it has been installed properly and will function as required by this part.
Wis. Admin. Code Department of Transportation § app 1 § 193.2325