Wis. Admin. Code Trans § Trans 276.09

Current through November 25, 2024
Section Trans 276.09 - Applicability
(1) The treatment of s. Trans 276.07(11m), (17m), (26m) and (40m) applies upon completion of the reconstruction of Liberty Avenue in Beloit and ending when the Beloit bypass authorized in s. 84.013(3) (rb), Stats., is constructed and designated by the department under s. 348.07(4), Stats., as a highway to which ss. 348.07(2) (f), (fm), (gm), and 348.08(1) (e) and (h), Stats., apply.
(2) The treatment of s. Trans 276.07(15m) applies when the state of Minnesota has designated Minnesota state trunk highway 70/county trunk highway 110 from the Wisconsin border to interstate highway 35.
(3) The treatment of s. Trans 276.07(10m) and (25m) applies after the segment of STH 182 from the Iron-Price county line to Park Falls is reconstructed and all construction signing is removed in 1999.
(4) The treatment of s. Trans 276.07(12m) applies after the intersection of STH 26 and STH 59 in Milton is modified to accommodate turning trucks in the northeast and southeast quadrants.

Wis. Admin. Code Department of Transportation Trans 276.09

Cr. Register, July, 1990, No. 415, eff. 8-1-90; 276.09 renum. to (1), Cr. (2), Register, May, 1991, No. 425, eff. 6-1-91; r. and recr. (2), Register, July, 1992, No. 439, eff. 8-1-92; Cr. (3), Register, January, 1996, No. 481, eff. 2-1-96; renum. (1) (intro.) to be (1) and am., r. (1) (a) to (c), Register, April, 1997, No. 496, eff. 5-1-97; r. and recr. (3), Register, July, 1999, No. 523, eff. 8-1-99; Cr. (4), Register, December, 1999, No. 528, eff. 1-1-00; correction in (1) made under s. 13.92(4) (b) 7, Register February 2013 No. 686.

The reconstruction of Liberty Avenue in Beloit is expected to be completed in the fall of 1999 and the construction of the Beloit bypass authorized in s. 84.013(3) (rb), Stats., is scheduled for completion in the fall of 2001.