Current through September 30, 2024
Section SPS 343.10 - Plan examination and approval(1) DEPARTMENT APPROVAL. Department plan approval shall be obtained before commencing construction of any new or additional permanent storage installation for anhydrous ammonia.(2)PLANS, SPECIFICATIONS AND INFORMATION. Plans, specifications and information submitted to the department for review and approval of anhydrous ammonia installations shall contain all of the following:(a) At least 4 sets of plans, which are clear, legible and permanent copies; one copy of specifications; a completed application form; and the required fees.(b) The name of the owner; the name of the person, firm or corporation proposing the construction or installation, if other than the owner; and the address of the installation, including the names of adjacent streets and highways.(c) A plot plan, drawn to a minimum scale of one inch equals 20 feet, indicating the location of the installation with respect to property lines, lot lines, adjoining streets or alleys and other buildings on the same lot or property. The layout of buildings, containers, loading and unloading docks, type of construction of each building and any stream or body of water within 150 feet of the containers shall also be indicated.(d) The location, size and capacity of each system and container.(e) The type of container supports, clearances, type of venting and pressure relief used and combined capacity of all venting and relief valves on each container.(f) A plot plan showing the land use of the area surrounding the proposed site for a distance of 2000 feet.(3)LOCAL APPROVAL. Approval of a permanent storage installation site for anhydrous ammonia shall be obtained from the local fire department and shall be verified at the time of plan submittal.(4)ADDITIONAL APPROVAL. Approval of plans is based upon compliance with the requirements of this chapter. Construction, installation and operation of anhydrous ammonia systems may be subject to compliance with additional requirements in state and local building codes, local zoning and similar ordinances.(5)APPLICATION FOR APPROVAL. Application for approval of an anhydrous ammonia installation shall be made in writing on form SBD-6038. Note: The Department forms required in this chapter are available for a nominal fee at telephone 800-DOC-SALE or 411 (Telecommunications Relay) or at docsales@doa.state.wi.us, or at no charge at the Department's web site http://dsps.wi.gov through links to Division of Industry Services forms.
(6)APPLICATION PROCESSING TIME. Pursuant to s. SPS 302.07(3), the department shall review and make a determination on an application for installation approval within 15 business days.Wis. Admin. Code Department of Safety and Professional Services SPS 343.10
Cr. Register, September, 2000, No. 537, eff. 10-1-00; CR 06-119: am. (6) Register July 2007 No. 619, eff. 8-1-07; correction in (6) made under s. 13.92(4) (b) 7, Stats., Register December 2011 No. 672.