Wis. Admin. Code Department of Safety and Professional Services SPS 318.4207

Current through August 26, 2024
Section SPS 318.4207 - Installation and inspections
(1) Substitute the following for the requirements in ANSI E1.42 section 7.1.1: Orchestra pit lifts shall be tested in accordance with the applicable criteria in ASME A17.1 section 8.6.
(2) The requirement in ANSI E1.42 section 7.1.4 is not included as part of this subchapter.
(3) Substitute the following for the requirements in ANSI E1.42 section 7.2.2: Compliance testing may be observed by the department.
(4) Substitute the following wording for the requirements in ANSI E1.42 section 7.9.7.5: Any additional issues as identified by the manufacturer's instructions or noted by the department during previous inspections.
(5) These are department rules in addition to requirements in ANSI E1.42 chapter 7:
(a) Periodic inspections shall be made at intervals not longer than one year.
(b) Periodic tests in conformance with ANSI E1.42 sections 7.3, 7.4, 7.5, and 7.8 shall be made at intervals not longer than one year.
(c) Periodic tests in conformance with ANSI E1.42 sections 7.6, 7.7, 7.9, and 7.10 shall be made at intervals not longer than 5 years.

Wis. Admin. Code Department of Safety and Professional Services SPS 318.4207

Adopted by, CR: 19-118: cr. Register May 2020 No. 773, eff. 6/1/2020