Wis. Admin. Code Department of Safety and Professional Services SPS 318.1811

Current through August 26, 2024
Section SPS 318.1811 - Maintenance logs
(1) WEEKLY OPERATION PROCEDURE. The requirements in ASME A18.1 section 11.1.2(c) are not included as part of this chapter.
(2) ON-SITE DOCUMENTATION. This is a department rule in addition to the requirements in ASME A18.1 part 11.3: For a lift having an inspection and test panel, the inside cover of the inspection and test panel shall provide instructions for locating the on-site documentation. Instructions shall be permanently legible with lettering not less than 1/8 inch in height.

Wis. Admin. Code Department of Safety and Professional Services SPS 318.1811

Adopted by, CR 19-118: cr. Register May 2020 No. 773, eff. 6/1/2020