Wis. Admin. Code NR § 210.24

Current through May 28, 2024
Section NR 210.24 - System Evaluation and Capacity Assurance Plan
(1) The department may require permittees that own and operate a sewerage system to prepare and implement a system evaluation and capacity assurance plan that meets the requirements in s. NR 110.10(4) whenever the department determines that one or more of the following conditions exists:
(a) Noncompliance with the prohibitions in s. NR 210.21(1).
(b) Noncompliance with effluent limitations at the sewage treatment facility caused by excessive flow.
(c) Implementation of the CMOM program requirements in s. NR 210.23 is not sufficient to attain the requirements of s. NR 210.21(1).
(d) Frequent or recurring building backups caused by excessive flow or other hydraulic constraints in the sewerage system.
(e) A system evaluation and capacity assurance plan is necessary to determine if the conditions of s. NR 210.21(1) (a) to (d) exist.
(2) The system evaluation and capacity assurance plan is subject to review and approval under s. 281.41, Stats.
(3) The department may include in a permit compliance schedules that require implementation of actions contained in an approved system evaluation and capacity assurance plan and that are determined necessary to meet the requirements of this chapter.
(4) Permittees that are implementing actions to conform with an approved facilities plan under ss. NR 110.08, 110.09, and 110.10 and that, when such facilities plan is implemented, will meet the requirements of this chapter and s. NR 205.07(1) (u) shall not be subject to the requirements of this section.

Wis. Admin. Code Department of Natural Resources § NR 210.24

CR 12-027: cr. Register July 2013 No. 691, eff. 8-1-13.