Current through October 28, 2024
Section NR 670.025 - Specific feasibility and plan of operation report information requirements for equipmentExcept as otherwise provided in s. NR 664.0001, owners and operators of facilities that have equipment to which subch. ch. NR 664 applies shall provide all of the following additional information:
(1)For each piece of equipment to which subch. ch. NR 664 applies, provide all of the following: (a) Equipment identification number and hazardous waste management unit identification.(b) Approximate locations within the facility (e.g., identify the hazardous waste management unit on a facility plot plan).(c) Type of equipment (e.g., a pump or pipeline valve).(d) Percent by weight total organics in the hazardous waste stream at the equipment.(e) Hazardous waste state at the equipment (e.g., gas, vapor or liquid).(f) Method of compliance with the standard (e.g., monthly leak detection and repair or equipped with dual mechanical seals).(2)For facilities that cannot install a closed-vent system and control device to comply with subch. ch. NR 664 on the effective date that the facility becomes subject to subch. ch. NR 664 or subch. ch. NR 665, an implementation schedule as specified in s. NR 664.1033(1) (b).(3)Where an owner or operator applies for permission to use a control device other than a thermal vapor incinerator, catalytic vapor incinerator, flare, boiler, process heater, condenser or carbon adsorption system and chooses to use test data to determine the organic removal efficiency or the total organic compound concentration achieved by the control device, a performance test plan as specified in s. NR 664.1035(2) (c).(4)Documentation that demonstrates compliance with the equipment standards in ss. NR 664.1052 to 664.1059. This documentation shall contain the records required under s. NR 664.1064. The department may request further documentation before deciding if compliance has been demonstrated.(5)Documentation to demonstrate compliance with s. NR 664.1060 shall include all of the following information: (a) A list of all information references and sources used in preparing the documentation.(b) Records, including the dates, of each compliance test required by s. NR 664.1033(10).(c) A design analysis, specifications, drawings, schematics, and piping and instrumentation diagrams based on the appropriate sections of ATPI Course 415: Control of Gaseous Emissions, incorporated by reference in s. NR 660.11, or other engineering texts acceptable to the department that present basic control device design information. The design analysis shall address the vent stream characteristics and control device operation parameters as specified in s. NR 664.1035(2) (d) 3.(d) A statement signed and dated by the owner or operator certifying that the operating parameters used in the design analysis reasonably represent the conditions that exist when the hazardous waste management unit is operating at the highest load or capacity level reasonably expected to occur.(e) A statement signed and dated by the owner or operator certifying that the control device is designed to operate at an efficiency of 95 weight % or greater.Wis. Admin. Code Department of Natural Resources NR 670.025
CR 05-032: cr. Register July 2006 No. 607, eff. 8-1-06; correction in (2) made under s. 13.92(4) (b) 7, Stats., Register March 2013 No. 687.