Nonmetallic mining reclamation shall be conducted and completed in a manner that assures compliance with water quality standards for surface waters and wetlands contained in chs. NR 102 through 105. Before disturbing the surface of a nonmetallic mining site and removing topsoil, all necessary measures for diversion and drainage of runoff from the site to prevent pollution of waters of the state shall be installed in accordance with the reclamation plans approved pursuant to an applicable reclamation ordinance. Diverted or channelized runoff resulting from reclamation may not adversely affect neighboring properties.
Wis. Admin. Code Department of Natural Resources NR 135.07