1. Water Systems, Sewage Systems, and Swimming Pools | |
A. Construction/Installation Permits | |
1. Public Water System Project | $300 |
2. Public Sewer System or Facility Project | $300 |
3. Public Swimming Pool Project | $200,000 |
4. Sewage Holding Tank Project | $1,000 |
5. On-Site Innovative/Alternative Type Sewage System | |
a. Correcting Failure | $250 |
b. New Construction | $400 |
B. Water Well Permits (New Construction) Public Water System | $150 |
2. Bottled Drinking Water/Water Vending Machine Permits | |
A. Distributors, Annually | $100 |
B. Producers and Distributors, Annually | |
C. Facility Size (measured in Gross Sales) | |
1. $0 to $7,499 | $35 |
2. $7,500 to $14,999 | $70 |
3. $15,000 to $24,999 | $100 |
4. $25,000 to $49,999 | $200 |
5. $50,000 to $99,999 | $300 |
6. $100,000 to $499,999 | $400 |
7. $500,000 to $999,999 | $500 |
8. $1,000,000 to $4,999,999 | $600 |
9. $5,000,000 to $9,999,999 | $700 |
10. $10,000,000 to $24,999,999 | $800 |
11. $25,000,000 to $49,999,999 | $900 |
12. Greater than $50,000,000 | $1,000 |
Radiological Registration | |
3. Business (or Individual) Providing Vendor Services | $150 |
A. Radioactive Material | $150 |
B. Radiation Machine Facility (initial or renewal) | $150 |
C. Reciprocity | $150 |
D. X-ray Public Health Screening Application | $150 |
E. Radiological Inspection | |
4. Decommissioning | $500 |
A. Dental Intraoral Machine per Tube | $80 |
B. Dental Panoramic Machine per Tube | $80 |
C. Dental (Other than intraoral or panoramic) per Tube | $90 |
D. Emergency Services Consultation | $100 per hour |
E. Industrial Cabinet X-ray System per Tube | $90 |
F. Industrial High Energy Machine per Tube | $120 |
G. Industrial Radiographic Machine per Tube | $90 |
H. Industrial Radiation Machine (Other) per Tube | $90 |
I. Medical Diagnostic Machine per Tube | $90 |
J. Medical Therapeutic Machine per Tube | $250 |
K. Radiation Machine per Tube (Other than Diagnostic or Therapeutic Machines, used for research or other purposes) | $90 |
L. Radioactive Material Facility Close-out Survey | $120 |
M. Radioactive Material Inspection | $170 |
N. Shielding Plan Review | $90 |
O. Veterinary Machine per Tube | $90 |
P. Asbestos Abatement | |
5. Training Accreditation | |
A. Course Approval Per discipline/maximum | $1,000/$3,000 |
1. Review Course Approval | $500 |
2. Notification - Inspection of Projects | |
B. Class I: 10-100 linear ft. or 50-200 sq. ft. | $100 |
1. Class II: more than 100 and less than or equal to 1000 linear ft. or more than 200 and less than or equal to 2000 sq. ft. | $300 |
2. Class III: greater than 1000 linear ft. or greater than 2000 sq. ft. | $700 |
3. Class IV: Annual Industrial Facility | $2,000 |
4. Annual Low-Level Radioactive Waste Generator or Storage Fee | $12,500 |
6. 7. TENORM Processing and Storage | |
Registration | |
A. Initial Plan Review | $5,000 |
1. Approved Plan Revision | $2,500 |
2. Registration | $3,000 |
3. Proof of Financial Surety of a Minimum of $1,000,000 | |
B. 8. School Radon Testing | |
Test fee per sampling point | $17.50 |
A. Bureau staff time per hour | $25 |
B. 9. Food Manufacturing Facility Permit (Annual, Expires 6-30) | |
Facility Size (measured in Gross Sales) | |
A. $0 to $7,499.99 | $35 |
1. $7,500 to $14,999.99 | $70 |
2. $15,000 to $24,999.99 | $100 |
3. $25,000 to $49,999.99 | $200 |
4. $50,000 to $99,999.99 | $300 |
5. $100,000 to $499,999.99 | $400 |
6. $500,000 to $999,999.99 | $500 |
7. $1,000,000 to $4,999,999.99 | $600 |
8. $5,000,000 to $9,999,999.99 | $700 |
9. $10,000,000 to $$24,999,999.99 | $800 |
10. $25,000,000 to $49,999,999.99 | $900 |
11. Greater than $50,000,000 | $1,000 |
12. Food Manufacturing Plan Review Fee | |
B. New or Remodeled Facility Size 1-4 | $100 |
1. New or Remodeled Facility Size 5-8 | $200 |
2. New or Remodeled Facility Size 9-12 | $300 |
3. 10. Food Establishment Permits at State Facilities (Annual, Expires 6-30) | |
Seating Capacity | |
A. 0-20 | $100 |
1. 21-50 | $200 |
2. 51-80 | $300 |
3. 81 and over | $400 |
4. 11. State Institution Permits (Annual, Expires 6-30) | |
Juvenile Detention Centers, by capacity | |
A. 0-25 | $50 |
1. 26-50 | $100 |
2. 51-75 | $150 |
3. 76 and over | $125 |
4. Juvenile Correctional Centers | |
B. 0-25 | $50 |
1. 26-50 | $75 |
2. 51-75 | $100 |
3. 76 and over | $125 |
4. Correctional Center and/or Jail (Regional) by capacity | |
C. 0-200 | $100 |
1. 201-400 | $150 |
2. 401-600 | $200 |
3. 601 and over | $300 |
Work Camp by capacity | |
0-50 | $100 |
51-100 | $200 |
1. E. State Operated Schools (Does not include Colleges and Universities) | $50 |
2. |
W. Va. Code R. agency 64, tit. 64, ser. 64-51, app B