W. Va. Code R. agency 64, tit. 64, ser. 64-47, tbl. 64-47E

Current through Register Vol. XLI, No. 45, November 8, 2024
Table 64-47E - BUFFER ZONE REQUIREMENTS FOR SEWAGE TREATMENT WORKS

Treatment Facilities

Buffer Zone

Requirements

(feet)

Sewage Treatments Plants:

40,000 GPD or less

40,001 - 100,000 GPD

greater than 100,000 GPD

100

200

300

Other Treatment Facilities:

Polishing ponds

Package sand filters

Alternating surface sand filters

TKN removal equipment

Aerated lagoons

Constructed wetlands

Recirculating sand filter systems

Stabilization ponds

Trickling filters

Land treatment systems

100

100

100

100

100

100

100

300

300

300

These requirements DO NOT APPLY to existing treatment works that are being upgraded or expanded.

W. Va. Code R. agency 64, tit. 64, ser. 64-47, tbl. 64-47E